Certanum / Evidence
Evidence before assurance.
Certanum asks institutions to rely on evidence rather than assurance. The same applies to Certanum. Each item below is published and independently inspectable — including what has not yet been established.
Open standard
AP-1 v1.2 — in force
The Admissibility Protocol, the open standard Certanum is designed to satisfy. Published by ZORRZ Financial Inc. under CC BY 4.0.
Draft revision
AP-1 v1.3 — draft, not adopted
The draft revision and its public comment record. Every substantive comment is dispositioned in public.
Reference instrument
AP-1 reference runner
MIT-licensed and executable by any party, against any system, without the publisher’s involvement.
Correction record
Errata, published in full
Every recorded defect in the standard and the instrument, with its effect on published figures — including the findings that remain withdrawn.
Methodology
Registered analysis procedure
The measurement method and analysis plan, registered on OSF on 15 August 2026, after the reference runs. It registers the method, not any one evaluation.
Open discussion
FINOS AI Governance Framework
A proposed mitigation for verifiable operand provenance, under discussion in the FINOS AI Governance Framework. Proposed, not adopted.
Known limitations
What has not been established
No independent evaluation of AP-1 has been completed, and no party unconnected to the publisher has executed the instrument. Certanum is commercial infrastructure in development.
A standard whose author declines to be measured by it is a brochure. The correction record exists because the instrument was applied to its author’s own work first.
Founding pilots
Put a real workflow to the test.
Two founding pilots, in financial services or pharmaceuticals. One workflow, one class of consequential figure, success criteria agreed before we begin.